Honourable Speaker,
Honourable Premier of the Western Cape Province, Mr. Rasool,
Provincial Cabinet Colleagues,
Members of the Parliament,
MECs from the NC and EC,
Chairpersons of the NCOP Select Committee on Finance and Local Government,
Chairperson of SALGA,
Executive Mayors and Mayors,
Head of Departments,
Municipal Managers,
Partners in Local Government and Housing,
Invited Guests,
Comrades and Friends,
Ladies and Gentlemen.
1. Introduction and previous year's commitments
On 24 May 2006, I delivered to all present what was a Maiden Budget Inaugural Speech. Mr Speaker, I concluded that Budget Speech by making significant commitments that had to be achieved in the course of the financial year 06/07. We stand here today to honestly reflect on those commitments. Perhaps before we reflect progress, allow me to remindyou what those commitments were:
We said:
- We will deliver at least 16,000 houses and 18,000 serviced sites;
- We will develop an implementation plan for providing basic sanitation for all, and roll out at least 10 percent of that plan;
- We will relieve the stress in Site C, Khayelitsha through de-densification and upgrading;
- We will develop a shared services programme together with municipalities;
- We will establish youth units in all five district municipalities and in the metro;
- We will take another 250 CDWs through to graduation;
- We will work together with SALGA Western Cape to provide a comprehensive councilor development programme;
- We will roll out a special leadership programme for women councilors;
- We will provide a training course in sustainable human settlement planning to Project Consolidate municipalities;
- We will assist identified Project Consolidate municipalities with the appointment of their municipal managers;
- We will see an improvement in the Auditor-General's reports on municipalities;
- We will see significantly improved municipal IDPs and LEDs, and they will be aligned with provincial and national strategies and policies; and
- We will have a municipal monitoring system in place and an even more efficient Department.
As we sit here this afternoon, I am happy to report to you that in the main we have surpassed what we set ourselves to do. Allow me to give you the progress on the above starting with housing, planning and development, local government, disaster management and fire brigade services.
On Housing:
Honourable Speaker, I stood here last year and made commitments to this House, I therefore think it is proper that I give this House feedback on those commitments. I am comfortable in the knowledge that many of the initiatives that I committed to in my inaugural budget speech have been realized and are bringing comfort, security and dignity to thousands of citizens of the Western Cape. One of my leading commitments centered around an initiative to attract additional funding for human settlements to our province, the basis of which was to demonstrate capacity to responsibly spend the entire housing conditional grant at an accelerated pace. I can report that my department accomplished this three months before the end of the financial year, spending the entire grant allocation of R598m by the end of December 2006.
This achievement has instilled the necessary confidence in us and we were rewarded with a further allocation of R372m from the National Treasury towards the N2 Gateway development. Responsible financial management guided us in the spending of this money that was received late in the financial year and we were able to spend a further R177m by the end of March 2007.
Another of my commitments towards overcoming the housing backlog was to deliver 18 000 serviced sites and 16 000 houses based on an overall plan that was aimed at attracting an additional amount of R150m. Both of these targets have been exceeded by 543 and 42 respectively.
On Planning and Development:
Honourable Speaker in my 2006/2007 speech I committed that we will develop an implementation plan for providing basic sanitation for all and roll out at least 10 percent of the plan. I am proud to announce that we earmarked the Upgrade of Informal Settlement Programme as a tool to assist in delivering on this commitment and we have done so. We have to date approved 27 UISP projects and have spent R 299, 7 million in the 2006 / 07 financial year to provide services and access to water for 37 334 beneficiaries.
This programme enables an incremental in-situ upgrade of Informal Settlements which allows us to dignify our people's living conditions and provide basic services with minimum disruption to the already formed community networks whilst the people await the construction of the top structures.
Another programme I would like to briefly mention is the Emergency Housing Programme that has enabled us to intervene and move our people from life threatening situations to safer areas before we can give them their homes. We will never upgrade or develop any projects where we know our people are still in harms way.
Even though we cannot anticipate all manner of emergencies but we can be prepared on how to deal with it and in partnership with Municipalities move our interventions from being reactive to proactive. Last year in my speech I mentioned Bonnievale and the appalling condition in which the 67 families were living in next to pig sties and the town's refuse dump and with limited services. Through this programme I am proud to report thatwe have been able to relocate these families and provide basic services for all the families.
In Mossel Bay Municipality / Powertown the Informal Settlement in the floodplain was devastated by the floods in the Eden District in 2006. In partnership with a private developer we are looking at first relocating the 150 families to higher ground above the flood plain before we can plan the for the Integrated development for this community.
I also committed that we will relieve the stress in Site C, Khayelitsha through dedensification and upgrading. I would like to report that to date we have relocated to Kuyasa 1750 of the 2000 families that had to be moved in order to de-densify the area and formalized 3500 of the 6200 sites in Site C. Progress of relocation has been slow and has required my personal intervention through various meetings and community outreach programmes in order for me to engage with the community and lobby for their support to ensure we fast track the progress. 88% on relocation and 57% on formalization is commendable considering the challenges we face.
On Local Government:
- We have in partnership with all the district municipalities, the Western Cape youth commission and the district youth councils established district youth units that will develop and implement the district youth strategy and plan. As we celebrate youth month and as part of national youth service week, we had more than 400 young people volunteer to clean communities in Khayelitsha, Manenberg, Masiphumelele and Kuilsrivier.
- We have graduated more than 250 CDWs last year, and employed 200 of them into the Public Service, mainly in Project Consolidate Municipalities and Presidential Nodes. 36 CDWs were absorbed by our municipalities. We are currently seeking employment opportunities for the rest of the CDWs with other municipalities, State Owned Enterprises and other government departments.
- As mentioned earlier my department fast tracked councilor capacity building through the Provincial Councilor Summit and Councilor Induction programme.
- Through our partnership with GETNET we rolled out District based gender leadership training for women councilors facilitating women's municipal network to improve the effectiveness of political office-bearers. In addition we hosted the Deputy President Conference for Women in Local Government.
- In partnership with UCT and the False Bay College my Department trained councilors and officials with special responsibility for housing matters from all Project Consolidate municipalities on sustainable human settlement planning.
- Whilst we have not seen technical improvement from the AG report based year on year mainly because of the conversion from IMFO to GRAP, GAMAP, our partnership with Provincial treasury is turning the tide on improved financial viability.
- Providing hands on support through the Project Consolidate programme we have place 10 municipalities on an irreversible recovery path by providing specialist support, to build institutional capacity through filling of Municipal Managers and Section 57 vacancies, skills transfer, improvement of systems and processes, enhanced financial viability through improved revenue enhancement.
- On shared services we are already seeing the implementation of a shared service model in Central Karoo with the appointment of an internal auditing and supply chain competence.
On Disaster Management:
In order to comply with the purpose of the Disaster Management Act, the Disaster Management Centre in the province has to focus on the prevention of disaster risk, to mitigate the severity of disasters, emergency preparedness, as well as effective recovery processes to disasters.
- To achieve this goal the following processes were instituted during the 2006/07 financial year, namely:
- To mitigate disasters through risk and vulnerability assessments that were completed in three (3) District Municipal areas, namely Eden, West Coast and Cape Winelands;
- Capacity building through the Disaster Management Training, Education, Awareness and Marketing (TEAM) programme. Through this endeavour a total of 735 volunteers and 284 officials benefited from skills development programmes in first-aid, fire prevention, home-care, environmental health and disaster risk reduction;
- To comply with disaster recovery needs, the Disaster Management Centre has effectively dealt with several major fires in informal settlements, as well as mountain and veld fires. A total of 15 201 fires occurred during 2006 of which 15% was reported to be in informal settlements, whilst 85% of fires occurred in the fields and forest areas and approximately 116 000 hectare were effected by these fires;
- Over and above the usual environmental hazards there were also the major floods that occurred during July/August 2006, which is now a declared local disaster. An amount of R274 million was allocated by the National Disaster Management Centre (NDMC) for infrastructure damage that was caused by this devastating event;
On Fire Brigade Services:
A recent needs analysis has, however, revealed that at present, there is a huge backlog of approximately R415 million in fire brigade vehicles and related equipment provincewide. In this regard, I have personally registered the Western Cape needs with the National Fire Brigade Board in order to ascertain inter-governmental solutions for this problem and this matter will be one of my priorities in this financial year.
2. Scene Setting
Mr Speaker, with all of these achievements recorded during the period under review, we know for sure that we have only scratched the surface. Our people demand more than this. During the period under review we have indeed touched many lives. We have restored hope and unsettled many comfort zones. To illustrate my point, let me share the joys and tears of Mrs Daphne Damane with you. The Cape Times of 7 August 2006 published:
The matter was referred to this Department and at the time, both her legs had been amputated due to diabetes. After the Department successfully resolved her problem, this is what she said:
Mr Speaker, this budget vote is a response to Mama Damane's call. In reporting on what we are doing and what instruments we are using, it is also important to reflect on the challenging environment we operate under. It is indeed exciting to be in the service of the people of the Western Cape. In this place that we call HOME, we are quickly taught how to strengthen intergovernmental relations, in an environment of fragile coalitions. In less than a year and a half, the 30 municipalities in our province are now into the second wave of political leadership and the trend is continuing. More than 10 municipalities have changed leadership. We have a challenge in this regard. Many of our councillors (in the executive or ordinary) seem to be spending much of their energy on unseating others or doing everything including buying each other to remain where they are. We are the only province faced with this in the country. This is the worst level of uncertainty in local government ever. There was a time in the history of local government in the country when political leadership was re-elected every year. Then you had certainty at least for a yar. Since March 2006, things can change within 3 - 6 months. We have to live with this, as it is the will of the voters. But to avoid the collapse of service delivery to our people, we are paying an unprecedented attention to ensure stability in the administration of all our municipalities. Performance and compliance are areas of renewed emphasis.
The commitment of being hands on to our municipalities was acknowledged during the national Vuna Performance Awards in 2006. Two of our municipalities (Overstrand and Swartland), were celebrated. This department was voted the best countrywide in supporting municipalities.
We live in a Disaster prone province. Every season has its own challenges, from floods to fires. Again during the period under review we experienced both these types of disasters. We had a compound flooding disaster that caused the loss of life, economic and environmental setbacks particularly in the Eden District. Fires that occurred also caused loss of life and set us back economically and environmentally. These challenges left us wiser than before and have forced us to do better forward planning. I will say more about this later.
Homelessness in this Province continues to be an ongoing challenge. As you received your keys, a few people in your area were complaining about homelessness. In St. Helena Bay, people who grew up in Asbestos houses, got decent homes for the first time in their lives. The constraints and shortcomings in this area, challenge us to be more creative in pursuing solutions.
I would not be doing justice if I don't share with this House some of the common problems live-experienced by people like Mrs. Damane in the execution of housing projects. These problems include:
- Houses that are partially built, but the funds have been exhausted;
- Payments made to suppliers and builders but no houses have been built or materials supplied;
- Housing units not occupied by the approved beneficiary;
- Units illegally built on sites that do not belong to the occupants;
- Approved beneficiaries having built their units only to discover that they have built on the wrong plots.
- Approved beneficiaries have built houses but these are not yet ready for occupation.
3. "DRIE VOET"
In view of the challenges we face in this province, I have adopted a very simple but effective approach to accelerate service delivery to our communities. This approach is indeed aligned with long-term strategic agenda of the national Departments I work with. I call my approach in this Province, the 'DRIE VOET'. This is the term that has become known to the Department and in all Municipalities. This 'DRIE VOET' rests on threelegs:
- Accelerated Service Delivery and Quality Settlements
- Capacity Building and Public Participation
- Cooperative Governance and Accountability
This, in effect, sums up the work we do and the work we will continue to do, as such. The three pillars of the 'DRIE VOET' are interlinked and integrated signifying the interdependency of the three spheres of government. In everything we do, this 'DRIE VOET' is non-negotiable. When everything else fails, these three must stand out. 'DRIE VOET' is about guided fire and uninterrupted linkages. It's about Risk taking and Creativity.
In the next few pages, I intend to indicate what we are doing to fast-track services to our people, how we support municipalities to succeed in their mandates and how we institutionalize good governance at all levels. This, Honourable Speaker is done in the context and spirit of Batho Pele as the all embracing condition for excellent service delivery in government
3.1 Accelerated Service Delivery and Quality Settlements
In both the speeches of President Mbeki and Premier Rasool, the fact that Housing is indeed a contentious issue is highlighted, but the point that resonates the most is the fact that delivery has to be fast tracked. The reality is that we cannot continue to do things the same way and expect different results.
In light of this we recently hosted a Workshop on Innovative building technologies to getexposed to the innovative building methodologies and technologies in the market thatwill assist us deliver faster and cheaper without compromising on quality. The next phaseof this workshop is to implement projects using some of these technologies. We have togo beyond the brick and mortar.The building methodologies are some of the interventions towards fast tracking deliverybut at the same time with the ever increasing backlog and shortage of resources especiallyland, we have to move towards offering a greater range of housing options beyond tenure.The reality is that one size does not fit all. Densifying and increasing the Rental stock hasbecome a very viable and essential option for various reasons which we have to drivemore rigorously in this financial year and years to come. Two programmes are currently available for us to deliver on this housing option, namelySocial Housing and the Community Residential Unit.SOCIAL HOUSINGThis is a rental option geared at enabling the previously marginalized people with anopportunity to reside in prime locations close to job opportunities and amenities. Thisalso enables people who would otherwise not be able to afford living in these locations achance to engage in this first economy. We are also working on Employer assisted housing options where the employers in partnership with my Department developproperties for the employees close to their jobs and amenities.COMMUNITY RESIDENTIAL UNITS (CRU)This programme was developed as a response to the fact that Social Housing as it iscurrently does not cater for the lower income groups. This is another programme that willenable us to develop rental stock for the lower income groups and replace the HostelUpgrade Programme.In this Province like the rest of the Nation we have other demands that we have to dealwith including Rural Housing, Farm Worker Housing and Post Restitution development.These programmes are meant to assist us fast track delivery and deal with specificchallenges.RURAL AND FARM WORKER HOUSING
Rural Housing in our Province has not featured much on the agenda due to the fact thatour province does not have deep rural areas such as rural villages but we have farmworkerhousing. Currently my Department is involved in inputting into a policy to guidefarm-worker housing that has been crafted at the National Department. In partnershipwith the Departments of Land Affairs, Agriculture, Farmers associations and NGO's weare collaborating to formulate resolution to the matter of farm-worker housing in theWestern Cape context.
POST RESTITUTION DEVELOPMENTIn his State of the Nation address the Honorable President Mr. Thabo Mbeki said: "Whilethe land restitution programme has resulted in more settlements in the recent period, westill need to put in extra effort in dealing with remaining cases, many of which are muchmore complex".Honorable Speaker the Restitution of Land Rights Act, 22 of 1994 stipulates that peopledispossessed of land rights after 19 June 1913 as a result of racially discriminatory lawsand practices have the right for these properties to be restituted. My Department has beendriving this programme in the Western Cape in collaboration with Land ClaimsCommission, the Land Affairs Department and the City of Cape Town through theProvincial Land Restitution Steering Committee which we established to co-ordinate andfacilitate the finalization of restitution claims by the deadline of March 2008.PILOT AND LEAD PROJECTS
We have a number of what I call Special Projects which include both Pilot and LeadProjects that are meant to help us test the Human Settlement Strategy throughimplementing projects that would showcase what we have stipulated, help us to developbest practices and help us find ways to fast track delivery. I would like at this time to givea brief report back on progress on some of these projects that are at different stages ofimplementation. The following are some of the Pilot Projects which we have beenworking on:
- Grabouw - This project we are implementing in partnership with DBSA and theTWK Municipality. Planning is underway and will continue until the end of June2007. 4 projects have been identified within the initiative and Service providerswill be appointed by July 2007.
- Conradie - this is a partnership with the Provincial Department of Transport andPublic Works and the City of Cape Town. The specialists reports are completed.The EIA has been submitted.
- "Coming Together" is an initiative we are planning through the use of IGRmechanisms in partnership with Bitou Municipality and our sister Departments, itwas launched in July 2006 by the Deputy President and aims at RestructuringPlettenberg Bay through the creating of commercial and retail nodes andIntegrated Human Settlements close to amenities. The initiative has been brokendown into a number of projects with the 5 Workstreams established and aredriving towards implementation in the next few years.
We are also hard at work on the following Lead Projects:
- Site C, Khayelitsha - There are a number of projects earmarked for the decanting of people from Site C that are at different phases of development, namely Kuyasa,Mandela Park;
- Pendula Precinct - A property owned by Zanethemba Trust donated to thecommunity; and
- Thembokwezi, Washington Square - A property owned by Old Mutual to developGap Housing units;
SPECIAL PROJECTS
We have 11 special projects that we are implementing. These are projects that I haveinitiated as a result of visiting various communities and choosing specific interventions toextricate those communities from abject poverty and homelessness. My Department hasundertaken the responsibility to better the lives of the people in specific worsecircumstances. These projects are in Hawston and Stanford, Kleinmond, De Doorns,Kensington and Pine Road, Steenberg Cove, Bonnievale, Eerste-River/Gugulethu,Powertown, Cape Agulhus, Driftsands, Mosselbay - Toilets projects, and George - ToiletProjects.
ENHANCED DISCOUNT BENEFIT SCHEME
Honorable Speaker, many of our people endure tremendous hardship and often live underthreat of eviction because they cannot afford to pay their rental and home loaninstallments. To assist such people my Department has started to implement theEnhanced Discount Benefit Scheme, which allows me to extend a further discount topeople who want to acquire their homes.
We have started in Lentegeur, and have now extended the project also to Delft, Belhar,Ravensmead and Pelican Park. For this year an amount of approximately R9 million hasbeen spent on these discounts. Beyond the Discount Benefit Scheme the Department hasalso written off debt in the amount of approximately R4, 5 million owing by indigentpeople to whom the collection of such debt will cause undue hardship. From thefeedback that was received from beneficiaries, this programme has brought a great senseof relief and security, and, moreover, has helped to restore the dignity to those that havealready given up hope.
In this same operating environment, Mr. Speaker, the proliferation of bucket systems ofsanitation, in old, yet formal development is rife (not to speak of the informal challengeof no sanitation at all). Hence the introduction of the bucket eradication programmestarted in 2005 when the Western Cape was awarded R7m in the DORA to eradicate atotal of 2097 buckets in several municipalities.
This amount was followed up by R14m last year and R31m for 07/08. There has beensignificant progress with regard to the bucket eradication programme with projectcompleted in the following towns Rietpoort, Oudtshoorn, Rheendal, Concordia andNekkies. Despite funding challenges in certain municipalities, we remain confident thatthe national target of eradicating the bucket system in all formal settlements by December2007 will be met. It must however be noted that the rest of the bucket system in informalsettlements will be eradicated through the normal processes of human settlementdelivery.
In meeting this challenge, the Department of Water Affairs and Forestry have pledged±R13m towards the installation of water borne toilets for Zoar community. They arehelping us on the project that is registered on the MIG programme and the serviceprovider is currently working on the final design and the compilation of tenderdocuments.
The CDW programme is a concrete expression of developmental local government, andthis year the CDWs pragmatically demonstrated the President's vision of bringinggovernment closer to the people. CDW's have demonstrated their invaluable role byworking closely with all Disaster Management agencies, Community BasedOrganizations, Churches, and Local Businesses in the recent floods in Eden and fires inOverberg, registering victims, facilitate the access to material assistance, arrangingtemporary emergency shelter of victims with the involvement and support of multidisciplinaryteam.
CDWs have played an instrumental role in the success of the National Imbizo focus weekin the Western Cape help in the 15 priority areas identified in the Premiers State of theProvince Address and as part of social transformation programme. CDWs will alsoupdate ward profiles in partnership with the Department of Social Development. TheDepartment will also be actively involved in the coordination and the facilitation of theroll out of interventions in the 15 priority areas as part of the social transformationprogramme.
Let me share with you some of the success stories:
- John Ovis and Matheus Swarts, our CDW's in the West Coast DMA engagedwith three big businesses (Anglo American, Namakwa Sands, Grinaker LTA) andplayed an instrumental role in securing 65 permanent job opportunities at themine hence helping 65 families out of the poverty trap.
- Beauty Hlutyana, the CDW in De Doorn are proactively assisting the vulnerable,mainly orphaned children, by facilitating meeting with role-players includingNorway Foundation and local religious leader of the area. They intervention hasresulted in the establishment of a Wendy house as a Day care centre for the 30orphans with local church assisting with counseling, clothes and food distributionwhilst the Norway foundation will seek for Norwegian families to sponsor each ofthe 30 orphans.
- Xoliswa Tshukula, the CDW in Villiersdorp established a women sowing groupfunded by Department of Social Development producing school uniforms(tracksuits for the local schools and providing livelihood for 12 families.
- The CDW have also identified in partnership Bambanani, all the illegal Shebeensand Tik houses for the SAPS to follow up and to prosecute.
As legally required by the Disaster Management Act, Act 57 of 2002, the ProvincialDisaster Management Centre is providing ongoing assistance to the City of Cape Townand the five District Municipalities with the establishment of their Disaster ManagementCentres. This Department will contribute an amount of R1.5 million for the establishmentof the Central Karoo Disaster Management Centre. Through the establishment ofDisaster Management Centres in District Municipal areas, these areas will be enabled toco-ordinate the occurrence of major incidents and disasters. Furthermore, these Centreswould also provide for an integrated approach with other emergency related services,such as ambulance, fire brigade, traffic and municipal police.
It is also necessary to reflect on disaster recovery processes as conducted by theProvincial Disaster Management Centre. I am sure that all of us still remember thedevastating compound flood disaster, which occurred on 31 July to 3 August 2006 andagain on 24 to 28 August 2006. Currently the expenditure on the allocated emergencyfunding of the 2006 floods, as at March 2007 demonstrates a 42 % spend. It is envisagedthat a 60% spending of the allocated funds should be spent by the end of June this yearand the remainder of the recovery funds by the end of this financial year.
3.2 Capacity Building and Public Participation
We have finalized the Guideline for Human Settlement, which is intended to enablemunicipalities to compile their Housing Plans. These guides include the input from otherProvincial departments, NGO's, CBO's and Municipalities and are used in the 2 dayworkshops we have been running with municipalities where we assist them withcompiling their Housing Plans.
On the People's Housing Process Program (PHP) my department has implemented acompulsory comprehensive 60 day house construction training programme. Unemployedand unskilled beneficiaries of projects are be selected by the support organization toundergo the training including the construction controller. This training results in theaward of an accredited community building certificate, and covers all aspects ofbrickwork, carpentry, plumbing, plastering and painting. The training course will befinanced through the Department of Labor.
My Department has also recently completed new guidelines with respect to the duties andresponsibilities of the external facilitators and has formally trained internal and externalfacilitators and all municipalities on these new guidelines. In future my Department willimplement contractual and legally binding agreements with all accredited facilitators. Noexternal facilitator will be allowed to become a material supplier on projects that havebeen facilitated by him or her.
The department also monitored compliance in terms of the Municipal Property Rates Act and its regulations and ensure non-compliance is addressed in action plans. In terms ofthe Municipal Property Rates Act the department facilitated workshops on the Act withall municipalities to create awareness and compliance with the Act. The departmentprovided a generic rates policy, generic rates by-law as well as an example ofspecifications for the procurement of a municipal valuer to all municipalities. Additionalto this the department also provided a step-by-step guideline document and proceduralcirculars regarding Treasury Regulations to enable municipalities to plan within theparameters of their budgets. Through the DBSA's Local Government Resource Centre,this department published all important information regarding property rates andvaluations on the website in order to assist municipalities in this regard. The support onthis was expanded to provide a more comprehensive service to municipality that enabledthem to access and utilize the information from this system with their various strategicoperations. This service also enhanced a learning network amongst municipalitiesthroughout the country.
Hands-on capacity support were provided to project consolidate municipalities throughthe deployment Siyenza Manje Service delivery facilitators. This was provided through atargeted intervention by the Development Bank of South Africa.
This period also marks extensive support provided to Kannaland and Cederberg with theimplementation of their recovery plans with excellent progress with regard to CederbergMunicipality's' financial status.
3.3 Cooperative Governance and Accountability
To coincide with International Anti-corruption day on 9 December and the strongemphasis on Anti-corruption, a Western Cape "Anti-corruption" summit was hosted bythe Department of LG&H together with the Department of the Premier on 7 and 8December 2006 to promote good governance and share best practices. The theme of thissummit was "we stand together in defending development and delivery againstcorruption". This summit forms part of a comprehensive programme against corruption.At this occasion the national Anti-corruption Strategy was launched for the WesternCape. Anti-corruption workshops were held to support pilot municipalities with variouspolicies to prevent corruption actions.
With regard to investigation of PHP projects, two investigations were finalized (ChicagoBulls & Twinns) and the perpetrator was prosecuted.A further 9 projects were referred to the SIU for investigation in terms of the cooperativeagreement between the Department and the SIU. The wheels have also been set in motionbetween my Department, the National Department of Housing and the SpecialInvestigating Unit (SIU) to address irregularities in low cost housing under the auspicesof a Presidential Proclamation issued on 25 April 2007.
Also to inculcate a culture of responsible spending and accountability, my Departmentthrough the LGMTEC 1 to 3 processes, is constantly monitoring and interrogatingmunicipal budgets. For us a budget must adhere to three principles if it's going to beeffective and positively impact on the lives of communities. These principles are:
- Sustainability, does the municipality have sufficient revenue and adequatefinancial stability to fund and deliver on its budget?
- Credibility, can the municipality execute and deliver on this budgetrealistically? and
- Responsiveness, is the budget appropriately responsive to economic growthobjectives and socio-economic needs of the community, as measured inSEP-LG and prioritised in the IDP and LED?
Given the complex political environment we have done well to build relationship andfoster cooperative governance though all the IGR fora. Whilst issues around POWERSand FUNCTIONS remain challenges we have cemented the belief that our people seegovernment as one. So we must work together to ensure seamless government andaccelerated service delivery.
A Standard Community Fire Safety By-Law was promulgated in November 2006. This by-law amongst others provide for penalty for discarding burning cigarettes.Municipalities were encouraged to adopt and implement this by-law.
Close monitoring of municipalities led to a section 106 (Systems Act) investigation at theOudtshoorn Municipality in November 2006. This related to maladministration and poormanagement of the municipality. The findings of the Commission together with furtherregression necessitated a section 139 (Constitution) intervention which effectively placedthe powers and functions of the council and the municipal manager in the hands of anAdministrator appointed by Provincial Cabinet. This is the first section 139 interventionin the Western Cape since the implementation of the dispensation of local government.The situation in the Oudtshoorn Municipality has since been stabilized.
Part of our legislative support was to facilitate an amendment to the Less FormalTownship Establishment Act, 1991 (LEFTEA). This amendment has particular relevanceto Imizamo Yethu (Hout Bay) as it would provide for the extension of residential areasand inter alia for fast-tracking development of land for informal settlements.
4. Learning and Leading Organization
Administration
My Department has adopted a CONTINUOUS IMPROVEMENT PROCESS in order toposition ourselves as learning and leading organization. We recently undertook a study toassess our capacity and capabilities to deliver what we are supposed to deliver to ourpeople, namely basic services. Preliminary findings of this assessment illustrated withoutqualms that there is capacity gaps and we need to close these if we are to deliver servicesefficiently and effectively. Several critical posts were created as a result of thisinstitutional review process. The results of this institutional review process weresubmitted to Cabinet for approval.
As we grapple with local government and housing issues, we still have to ensurecompliance with other pieces of legislation such as the Employment Equity Act 55 of1998. As you may see from the figures below, my Department leads the Province.
| Western Cape | LG & H | |
| African | 29.7% | 32.44% |
| Coloured | 51.2% | 52.28% |
| Indian | 0.9% | 1.10% |
| White | 18.2% | 14.17% |
| Disability | 2.00% | 2.01% |
As at end March 2007, Gender representation STATS for my department is as follows:
| Western Cape | LG & H | |
| Male | 53.9% | 49.09% |
| Female | 46.1% | 50.91% |
We have more females than the Province, hence I say my Department leads! In line withour strategy to build SOCIAL CAPITAL in the Province, we will continue supportingstudents who are following careers in a local government and housing related field.
Sanitation backlog
In order to address concerns around the state and provision of municipal infrastructure, anInfrastructure Indaba was hosted by my Department and attended by MEC's, municipalmayors and councilors as well as officials of all municipalities on 15 and 16 March 2007.The aim of this was to come with innovative ideas on how this Province can deal withinfrastructure backlogs and also learn from the best in the industry. A focused outcome ofthis Indaba has been the establishment of a dedicated Infrastructure Team led by myDepartment in partnership with all District Municipalities, Provincial Treasury,Department of Water Affairs and Forestry and the Department of Provincial and LocalGovernment. This task team will produce a comprehensive District Infrastructure Plan forthe entire Province.
The Infrastructure Indaba was preceded by an in-depth assessment of the sanitationbacklogs in our province, an exercise funded through our close working relationship withthe Department of Water Affairs and Forestry. The study was able to assess the sanitationneed in each municipality based on present need as well as future growth and set thisneed at 410 000 families. In calculating a cost to provide the necessary water andsanitation requirements, projected growth over the next fifteen years was also considered.The exercise predicted a present day monetary need in excess of R10bn.
The N2 Gateway
Aligned to the need for continuous learning and leading is the N2 Gateway project whichis a national pilot to demonstrate the intention of the Comprehensive Plan for SustainableHuman Settlements - "Breaking New Ground". The project aims to bring shelter,comfort and security to tens of thousands of families residing in informal settlements andbackyards along the N2 freeway.
Whilst doing this, the project will also demonstrate the ways of creating social andeconomic integration by providing opportunities for rental, bondable and low incomeresidential units. The nature of project required the moving of families to temporaryrelocation areas which have since been termed "TRAs". The development of TRAs hasallowed for the moving of families out of areas of high risk, prone to life threateningfires, to shelter with access to basic services. Families will move out of these units intopermanent homes in a cyclical process.
The N2 Gateway was initially encumbered by issues of funding but has since gainednational support and separate funding from the National Treasury. Ring-fenced fundingfor this year is well in excess of R450m and progress on site generates the confidence thatthese funds will be comfortable and responsibly spent.
Housing Demand Data Base
In collaboration with National Government we commissioned a Housing Demand DataBase for the Metro to determine the needs of our people. The findings indicated that 79%of the population in the Metro earns less that R1 500, 18% earn between R1 500 and R3500 and only 3% earn more than R3 500. It indicated that currently 6% of the populationare living in Wendy houses, 31% in backyard rooms, 51% in shacks, and 12% are sharingwith the owner in a house, flat or hostel. The largest percentage of the population isbetween the ages of 26-30 years at 27% and the lowest between the ages of 46-50 years at5%. 37% of the population has no dependants, these could be young couples or singlepeople, 32% have 1 dependant, 19% have 2 dependants, 8% have 3 dependants and 3%have 4 dependants. It has also reflected that 37% of the population is employed and 63%not employed with only 32% able to afford to purchase and the 68% not having a regularincome. 1% have received assistance and 99% have not, of which 9% prefer rental, 7%did not declare and 84% prefer to own their own homes with a percentage within thatwilling to buy. 2% of the population would require special needs housing and 98%comprised of able people.
Quality of life survey
- I have also commissioned a Quality of Life Study to assess how service deliveryby my Department has impacted the lives of the people we serve. A range ofProject Linked, PHP and UISP projects were selected and focus group discussionswere conducted to obtain first hand feedback from beneficiaries on how the moveto a new house has benefited them or not. The projects were in Kuyasa(Khayelithsa), Mbekweni (Paarl), Nomzamo (Strand), Wallacedene(Kraaifontein), Nyanga Upgrades (Nyanga) and New Rest (Gugulethu). Thefindings indicate that the beneficiaries of the PHP and Project Linked programmeswere positively impacted however beneficiaries who benefited from UISP felt lessso. These findings indeed challenge us to take advantage of our strengths andexplore our developmental areas.
Communication
Honourable Speaker, as you might be aware, it is critical for my Department to maintainclose liaison with all communities. To this end, we are committed to improving internal(within Department) and external (Municipalities and the Public) communication. Forexample, the Rental Housing Tribunal has for the past years consistently increased thenumber of formal complaints dealt with. During 2005/06 487 formal cases were lodged,while up to January 2007, this figure already stands on 502. With an even larger increasein future, we are looking into bolstering the capacity of the staff to deal with the pressuresof assisting landlords and tenants in resolving disputes. This will be needed if the RentalHousing Amendment Bill becomes law, which will give more teeth to the Tribunal, butwill mean additional functions in line with the national drive to increase the rate ofreduction in case backlogs of our courts referred to, by the President. We are alreadyintensifying our communication and education efforts to prevent inhumane practices likeillegal evictions and illegal attachment of possessions.
In December last year, we launched a pilot CALL CENTRE for the Rental HousingTribunal in order to resolve disputes within the 90 day prescribed period. Both landlordsand tenants get free information and also lodge formal complaints through the CALLCENTRE. Consequently, this has expedited the registration of complaints and theresolutions thereof; it has also reduced calls to line-function releasing them to do othersupport functions to the members of the Rental Housing Tribunal. This service has thusfar proven very successful - so much so, that on average over 900 telephone calls havebeen received per month. Of these, an average of 50 formal complaints has been lodged.This shows how valuable an asset this is, as a large number of complaints have beenprevented by providing information at the point of contact.
My department continues to engage with communities on weekly basis in order to dealwith people-concerns first hand. This strategy pre-empted demonstration, protests,marches etc to our offices and increased understanding amongst communities about whatthe government does or plans for their areas. In the last financial year, I met and spokento more than10 437 community members province-wide. My slogan for these communityengagements Mr. Speaker is "We listen and do", "Simamela senze"; and "Ons luister andreageer".
Honourable Speaker, as part of our constitutional and oversight role, my Departmentconducted a survey to gauge the level of public participation in municipal IDP's andbudget processes and to provide the public with an opportunity to comment on the levelof service delivery within the various municipalities in the Western Cape. As part of thiscampaign we distributed 1.2million questionnaires to all municipalities, schools, andclinics in the province. 800000 questionnaires were responded to and returned. 15% ofthe returned questionnaires were stratified and randomly sampled and analyzed.Preliminary findings of this survey suggest that communities especially in the City ofCape Town still feel disconnected from the IDP and budget processes. Despite this trend,our resolve is to empower communities with information so that they can make informeddecisions about what is happening in their locality. We will also ensure that Speakers ofeach Municipality continue to report to me on a quarterly basis on their PublicParticipation programmes.
We encourage all municipalities to implement Ward and Community Based Planning. Ofthe 348 wards in the province, we supported the establishment of 211 wards. After 15months of trying Honourable Speaker, we still have none of the 105 Ward committeesestablished in the City of Cape Town. Again, despite this setback, we will continue tosupport and monitor the establishment of ward committees across the province. We willensure that ward committees are functional with dedicated municipal support that enablesmeaningful public participation.
Part of being hands-on on my part, is the responsibility to approve all municipal IDPs. IfIDPs do not meet the set standards, unfortunately they will not be approved.
5. Partnerships
As a Ministry and Department, we have also realized that we cannot face these enormouschallenges alone hence our strategic endeavours to enlist as many partners as possible toassist in transforming the lives our people for the better. Partnership with communities,private sector as well as NGO's is critical for our success in dealing with the complexitiesof our environment.
In my effort to accelerate housing delivery to communities, my Department has signed aMemorandum of Understanding with Peoples Housing Partnership Trust and two otherNGO's, Habitat for Humanity and Development Action Group (DAG),- my Departmenthas appointed them to unblock 10 projects in Khayelitsha. The key focus of both theseNGO's will be to unblock PHP housing projects in Khayelitsha and transfer skills inproject management and project construction to the support organizations in order forthem to successfully complete their housing projects.
In 2006, my Department developed a strategy in partnership with the Umsobomvu YouthFund (UYF) and the Department of Labor. This strategy is an integration of thegovernment run PHP programme with Youth Construction Training together with abusiness and life skill component. An additional benefit of the programme was theinclusion of an integrated Local Economic Development programme that addressespoverty in its broadest sense.
Mr. Speaker, through Public / private sector participation, donor funding was receivedfrom SAB Miller for a comprehensive toolkit presented to each learner on completion ofthe programme. This will ease the learner's entrance into the open market and enablehim/her to obtain work more readily. In December 2006 the youth programme producedthe first group of graduates; some of these youth have joined forces and formed their ownconstruction company, a company I will watch with interest.
My Department has engaged Thubelisha Homes, a housing support institution fromNational Government. Their broad brief from my Department is to reconcile certainblocked PHP Projects, present an independent audit and assist beneficiaries of empty sitesto obtain a top-structure, they have been appointed by my Department to unblock projectsin the Greater Philippi area, George, Mossel Bay, Paarl and Khayelitsha. Tenders havebeen called and construction is to commence soon. Added to this, Niall MellonTownship Initiative started their involvement with the PHP programme and are utilizingvolunteers from Ireland to assist with the construction of houses for example Netreg andMfuleni. The possibility of their involvement in projects outside the metro is taking placethis financial year.
The Mbekweni project in Paarl is an excellent example of the kind of partnerships thatare so essential if we are to address the pressing needs of South African society. It isinitiated by Provincial Government, supported by Local Government with assistancefrom the design consultants, Vernon Collis/Anna Cowen, the local Mbekweni communityin the form of the projects beneficiaries, the locally elected housing support committee,the local youth in the People's Housing Process driven skills training program,Umsobomvu and the Department of Labor, corporate entities like the Old MutualFoundation, South African Breweries, the Universities of Cape Town and Stellenbosch.Each party brings their own skill and perspectives, which continue to enrich andstrengthen the project.
Considering the limited resources that Government has at its disposal, partnerships haveproved to be an important mechanism for us to be able to fast track delivery.
We have established a number of partnerships in the past financial year including thefollowing:
- UN-Habitat South Africa connected with the global plans and strategies of theUN.
- "More than a Roof" a Social Housing Institution in Canada to exchange ideas andexperiences on implementing Social Housing developments
- NHBRC to ensure we align our endeavors with the support of this body to ensurequality assurance and control in all projects we would be developing especiallywith the use of the Innovative Technologies.
Various partnerships were forged with a range of stakeholders in relation to the CDWprogramme, e.g. training of CDWs' on cooperatives in partnership with Department ofTrade and Industry, a partnership with the South African Revenue Service on SMME taxindemnity campaign and a partnership with DWAF on water regulation and consumereducation.
6. Environmental challenges
Honorable speaker my portfolio is both exciting and extremely challenging. It is an uphillbattle that has to be won irrespective of whatever the shortcomings are. There are anumber of challenges I would like to mention that we face as we tackle this mammothtask and they include the following:
- The apartheid spatial paradigm that placed our people in the periphery
- The continuous in migration of people into the Western Cape
- The ever increasing backlog on the provision of housing
- The increase in Informal Settlements
- The parcels of land we own in my Department are in the periphery far fromeconomic nodes and job opportunities
- Insufficient resources to deal with the challenges and demands
- The ever increasing costs in construction
- Programmes that do not cater for all income groups
- The weather conditions in Cape Town which demand better quality services andrevised designs to houses.
- Community biased against rental versus tenure and Innovative buildingtechnologies versus brick and mortar.
Irrespective of these challenges I am determined through innovative mechanisms to gainthe support of communities in respect of acceptance of new housing construction optionsthat will enable us to build faster and cheaper without compromising on quality.
A major priority of my Department is its legislative and compliance mandate to providesystemic hands-on monitoring, support and intervention through cooperative governanceto ensure that the developmental agenda of the STATE (as a whole, but more specificallyLocal Government) is achieved, hence I always say that we sing from the same hymnsheet whilst conducting the different voices.
This was demonstrated when we received the National VUNA accolade for being the bestprovince supporting municipalities. Even DA spokesperson Willem Doman recentlyacknowledged that my department had delivered even though we have the most complexand dynamic environment.
The ride on the crest of a wave of accomplishments has not as yet cast our citizensbeyond the grips of poverty and the hardships associated with such circumstances. Ifanything, it has helped us to further understand the mammoth tasks that lie before us andhas evoked the commitment to succeed that comes from seeing that our mission isattainable.
Faced with an increasing population of homeless families, rising costs, a scarcity of andcompetition for natural resources - the most important being land, limited financialresources and competition from other sectors in the construction industry, total dedicationis necessary to remain focused.
Evictions on bonded houses and the selling of subsidized houses by their legitimatebeneficiaries to other people remains a huge problem and contribute to the ever growinghousing backlog that I have already alluded to.
Capable personnel are exiting our sector to engage in the more lucrative constructionmarkets. Developing and strengthening existing capacity to meet our challenges willassist in attaining our envisaged outcomes. Prime real estate that will further the ideologyof a comprehensive plan for integrated human settlement, is unaffordable within theparameters of present funding but is readily acquired by private developers therebyfurther enforcing economic segregation.
Contributing to the restricting pace at which new human settlements can be developed isthe current capacity and condition of many bulk infrastructure facilities. These are presently operating well beyond their design capacities and lack of preventativemaintenance has resulted in some facilities being unable to achieve their intendedcapacities.
State funding to provide increased bulk infrastructure capacity is limited and misalignedto the quantum of funding for housing provision. Revised frameworks for bulkinfrastructure grants are now being considered at a national level.
An imperative for local government is to be the conduit to mobilize and incite varioussectors of their communities to become involved and to fulfill a meaningful role inassisting emergency services to more effectively be able to resource and manageincidents. Amongst others, local government must ensure that they;
? conduct risk assessments in their areas of jurisdiction and that measures are taken to prevent incidents from occurring,
? have emergency plans in place based on the identified credible risk scenariosprevailing in their respective areas so as to be able to deal with incidentsshould they occur,
? make provision for developing pro-active programs aimed at ensuring aconstant preparedness to respond and deal with emergency incidents,
? constantly introduce initiatives that promote a strong sense of awarenessregarding emergency management aspects amongst their communitymembers
Amongst others, the development and expansion of towns and cities often results inincreased populations, more vehicles on the roadways and increased quantities ofhazardous substances. Development and expansion of towns and cities in South Africa(and in particular the increased populations and movement of populations to urbanizedareas) brings with it the proliferation of informal settlements. These settlements areinherently unsafe, unhygienic, and pose a huge fire risk due to the degree ofcombustibility of the structures and contents, the number of people occupying therelatively small confined area, the proximity of dwellings from one another and thedifficulty for emergency workers to gain access to the area.
As most towns develop and expand so does; the extent of the risks, the probability of therisks to manifest into emergency incidents, the severity of the potential consequences ofthe risks as well as the impending frequency of incidents arising from the increased risks.With such an increase in risks comes a proportional challenge for disaster and emergencyservice managers to be able to control and deal with incidents arising from these risks.
As a result, it is vitally important for managers within disaster and emergencymanagement services to be integrally involved in the planning, development andexpansion phases and processes of their towns and cities (i.e. already from the incipientstages). It is imperative that they are permitted to be involved and are enlightened so as tosee the bigger picture regarding what is being perceived and planned for the area at theearliest possible stage. This will enable them to fulfill a much more meaningful role inidentifying relevant disaster prevention related aspects and advising on relevant issuesconcerning emergency management.
It is unfair to expect that local government should be regarded as the sole provider ofresources to manage every emergency incident occurring within its area of jurisdiction.
7. Commitments for 2007/08
Moving on and wanting to escalate the levels of success attained over the past financialyear, there are new commitments that I want to lay before you today. These include thefollowing:
- Together with CCHC, NHBRC, NHCF, and CITY, we will be driving the houserectification programme in Eastridge, Luyoloville, Pylon, Manenberg, StorkRoad, Railway, Newfields, Woodridge and Morgen's Village.
- We will spend R668m in the 15 priority areas identified by Premier Rasool overthe next two years, of which R428m will be spent in this financial year.
- In as much as we have given a greater quantum of grant funding towards humansettlement development, revisions to the minimum requirements for housingprovision has seen the introduction of the 40m2 unit with improved quality. This therefore means that the additional funding cannot deliver additional sites andhouses but a higher level of comfort to beneficiaries of houses. I am thus able tocommit to once again delivering 18 000 serviced sites and 16 000 houses in thisfinancial year.
- Continuing the eradication of the bucket system of sanitation beyond formal areasby using the Upgrading of Informal Settlements and the Emergency HousingProgrammes?
- Implementing the first phase of departmental reorganization to enhance capacityand accountability as well as support to municipalities and communities
- Closing off old business in the PHP projects in order to release capacity to deliveron new initiatives and programmes
- We will roll-out municipal summer schools, creating a learning network amongstMunicipalities show-casing best practice this year.
- The remaining 10% of work that needs to be done at the Disaster ManagementCentre in Tygerberg will be completed in the first six months of this financialyear;
In this financial year, we plan to deliver a number of projects, formulate Policies andStrategies that will enhance service delivery to communities. I would like to give you asnap-shot of some of the projects.
Before I get to the project I would like to announce that the WCSHSS will be officiallylaunched on the 21st June 2007.
SOCIAL HOUSING
With our partner Communicare we will deliver the following Social Housing projects:
- Drommedaris which will yield 677 units
- Bothasig which will yield 168 units
- With NHFC in Pine Road a project that will yield close to 500 units.
HOUSE OCCUPANCY SURVEY
We will conduct a House Occupancy Survey in various areas including Westbank andDelft.
RURAL HOUSING
The projects we will deliver on in this financial year in partnership with Municipalitiesinclude:
- Cederberg Municipality: Wupperthal Rural Housing Project for 150 Ruralsubsidies.
- Theewaterskloof Municipality: Genadendal Rural Housing Project for 100 Ruralsubsidies.
HUMAN SETTLEMENT DEVELOPMENT
We will be implementing a number of projects with our partners in this financial yearnamely:
- Thembokwezi/Washington Square, Khayelitsha - with Old Mutual Properties andNedbank to develop 10 hectares of the property owned by Old Mutual to yield540 Gap Housing units and a shopping complex
- Phendula Precint - with ABSA developing a property in Khayelitsha owned bythe Zanethemba trust to yield 106 flats units and 85 single residential units for theGap market
- Belhar CBD - with Superstrike a BEE Consortium to develop 28 hectares of ourproperty in the Belhar area including Integrated housing and establishing aeconomic node to offer job opportunities which aims to yield 2300 - 2800housing units
- Paarl, Dal Josafat - with the Drakenstein Municipality to develop 39 hectares ofour property for Integrated housing with a specific focus on a yield of 1200 - 1400 gap market units
- Stellendale - with Visual International to provide 140 Gap housing onapproximately 4hectares on our land in a cross subsidization development
- Brentwood Park - with adjoining land owner to provide 240 GAP housingopportunities on 7hectares of our property
- Erf 105 and 107 in Eerste River - in partnership with the Support Group andpossible banks and property developers to implement on 25 hectares of ourproperties a Human Settlement Development that will showcase true Integrationof different of different races and income groups to yield approximately 1000housing opportunities.
In total, these partnerships will yield 6 300 over and above the 16 000 housing units fromthe conditional grant.
DELIVERY THROUGH LAND RELEASE/CONVERSION
Speaker, our land audit has revealed that we own large parcels of land situated on theperiphery which contradicts what our Human Settlement Strategy stipulates which in anutshell dictates that we must bring people closer to the centers of economic activities. Iam happy to report that we are already developing some of our properties that are situatedin suitable areas so as to attain the mentioned objective of the Human Settlement Strategyand many more will be developed in the next few years. We have compiled a land releaseplan that identifies approximately 136 hectares of land in the Cape Metropolitan Areawhich will be made available for development between 2007 and 2009. These propertiesinclude Ottery Bufferstrip, Khayelitsha, Eerste River, Delft Symphony, Ilitha Park andHighbury Park, Brackenfell in partnership with NHFC and Gugulethu
VOLUNTEER HOUSING
We are planning for this financial year to train 1000 volunteers to assist in building PHPhouses.POLICIES AND STRATEGIES
Other programmes we are currently working on to be completed this year include thefollowing:
- Elimination and Prevention of the Re-Emergence of Slums Act
- Farmworker Assistance programme
- Inclusionary Housing Programme
- Backyard Assistance Programme to be completed in this financial year
DEMAND DATABASE
Honourable Speaker, to ensure that we recognize and respond to the diverse housingdemands, we need a new approach to data and information collection and reporting thatwill provide decision-makers with evidence-based analysis of socio-economic needs,success (and failure) cases; areas in need of intervention; and evaluations of specificinterventions. In partnership with the National department we will be rolling out acomprehensive housing demand data base to all district municipalities. This systemwould be a move away from the waiting list with the support of a GeographicalInformation System (GIS) for tracking and representing in spatial form the key drivingforces, pressures, status, impacts and responses within and across localities.
FUTURE PLANS
- Gugulethu-Eerste River Project- in partnership with the Support Group is aimedat developing our property to yield an Integrated Human Settlement developmentwith amenities to support the new community. This PHP project is one of the flagship projects that will display on the ground the practical integration of twocommunities from different racial and economic groups settling in one area. Weare breaking ground by the end of this calendar year on this project and lookforward to the completion of the project in the next financial year
- Imizamo-Yethu in Hout Bay- in partnership wit the City of Cape Town is aimedat developing properties and upgrade existing township. This project willendeavor to formulate resolutions to the long standing housing problems in theHout Bay area. We embrace the process led by the Institute for Justice andReconciliation (IJR) that has to date successfully managed to get all the residentsof the area to communicate and in unison work towards finding a solution for all.Although the project is still at the initial stages it is a promising project that would also showcase in line with our Strategy true integration.
8. Conclusion
In conclusion, I would like to repeat some suggestions made to us by one of the bursaryholdersof the Department when she urges us to:
"... commit to spend our allocated budget ..." and we have done that;
"... the housing allocation budget should be tripled ...";
"... make use of cheap reliable construction techniques and material ...", a plea to us to go beyond the brick and mortar.
To Companie Fabio and all other students who wrote these essays to us, I want to say wehave taken note of solutions that you are suggesting. We also wish you well in yourstudies, so that you can be enabled more and be in the position to help us reconstruct thiscountry.
Mr. Speaker, I have reflected on progress achieved, lessons learnt and acknowledged thekind of challenges that we continue to face. We are aware that in comparison to what stillneeds to be done, the achievements recorded are merely a scratch on the surface. We pledge to do more and better with less.
I also want to take this opportunity to thank all who have made it possible for us toachieve our targets. These are our partners in communities, in the construction industry,service providers, many of our state owned enterprises, the sector departments active inour Province and the NGOs for enriching our work, and of cause members of parliamentfor your critical oversight role.
To the Ministry staff and the Departmental Teams, thank you for your understanding,passion and commitment. Without you there is no driving force. To the HOD Ms ShanaazMajiet your leadership role is appreciated and celebrated.
"It is not the structures and systems that matter most; it is the will of the people to makethem work"
C D. Craythorne _1993